
Utillizing Pacesetter’s Orbit RSS and XEM MWD, paired with NOV ReedHycalog’s 159mm TK53-B1 drill bit, CNRL drilled 3,303m in 81 hours resulting in a record ROP of 40.8m/hr.
Congratulations to Canadian Natural Resources Limited, the rig crew of Horizon 48, and NOV ReedHycalog on this great accomplishment.
OPERATOR Canadian Natural Resources Limited
HOLE SIZE 159mm
HIGHLIGHTS
RUN DETAILS 2347m to 5650m
DRILLED 3303m
HOURS 81 hrs
ROP 40.8m/hr
TECHNOLOGIES
Pacesetter’s modified Orbit RSS breaks records in the Pembina field Using Pacesetter’s combined technologies of XPACE EM MWD and our modified PowerDrive Orbit RSS, one Operator drilled 3 record wells in the Pembina field. The vertical and build sections on the final 2 wells were drilled while continuing on into the lateral reaching TD in […]
Read More
Aspenleaf Energy drills deepest MD Swan Hills well Congratulations to Aspenleaf Energy Limited together with the rig and crew of Ensign 32 on this achievement. Pacesetter’s combined technologies, paired with an Impulse “Hex Drive” motor and triple “Actipulse” friction reduction tools, drilled a tortuous and challenging well plan in the Swan Hills formation to a […]
Read More