Using Pacesetter’s combined technology of XPACE Dual Telemetry MWD and our modified PowerDrive Orbit RSS with Acoustic Live Communication, CPEC drilled a record breaking 9,017m MD well.
The 5,815m lateral was completed in a single run, drilling for 94 hours with an average ROP of 61.9m/hr.
Congratulations to Crescent Point Energy Corp. and the rig crews of Ensign 148 for this incredible achievement!
Thank you to Pacesetter’s DD and MWD Supervisors Collin Maier, Gene Huber, James Slimmon, Kaylen Wiancko and Tim Adamyk for their dedicated work on this project.
OPERATOR Crescent Point Energy Corp.
HOLE SIZE 171mm
RUN LENGTH 5,815m
TOTAL DEPTH 9,017m MD
HIGHLIGHTS
TECHNOLOGIES

Pacesetter’s Orbit RSS breaks records drilling 4,964m in a single run Using Pacesetter’s combined technology of XPACE EM MWD and our modified PowerDrive Orbit RSS, Canadian Natural Resources Limited drilled the longest 159mm RSS run, and their deepest Falher well in the Sundance field. The 4,964m lateral was completed in a single run, drilling for […]
Read More
Fastest of 4 Montney wells in the Valhalla field drilled in less than 8 days Canadian Natural Resources Limited drilled their fastest Montney well in the Valhalla field by utilizing Pacesetter’s Redline Pulse MWD along with our High Speed and Performance motor. The single run 2,971m lateral was drilled at an average ROP of 63.6m/hr, […]
Read More