
Total Depth
7,356m
Lateral Length
4,500m
formation
Montney
In January 2018, NuVista Energy drilled the longest well and longest lateral section in Western Canada. This Montney well had a total depth of 7,356m with a 4,500m lateral displacement.
Pacesetter would like to congratulate NuVista and the crews of Nabors 127 for this exciting accomplishment!
Pacesetter’s modified Orbit RSS breaks records in the Pembina field Using Pacesetter’s combined technologies of XPACE EM MWD and our modified PowerDrive Orbit RSS, one Operator drilled 3 record wells in the Pembina field. The vertical and build sections on the final 2 wells were drilled while continuing on into the lateral reaching TD in […]
Read More
Aspenleaf Energy drills deepest MD Swan Hills well Congratulations to Aspenleaf Energy Limited together with the rig and crew of Ensign 32 on this achievement. Pacesetter’s combined technologies, paired with an Impulse “Hex Drive” motor and triple “Actipulse” friction reduction tools, drilled a tortuous and challenging well plan in the Swan Hills formation to a […]
Read More