CNRL drills record well using Pacesetter’s Live RSS
By utilizing Pacesetter’s Orbit Rotary Steerable System combined with Short-Hop Live Link and XPACE EM MWD, Canadian Natural Resources Limited drilled a record Karr well in just 9 days.
Pacesetter’s Live RSS drilled 3,166m in a single run, completing the well at 5,150m MD.
Congratulations to CNRL and the rig crews of Stampede 6 for this impressive achievement.
DUNVEGAN
OPERATOR Canadian Natural Resources Limited
HOLE SIZE 311mm / 200mm / 159mm
TOTAL DEPTH 5150m MD
HIGHLIGHTS
- 3,166m drilled in a single run
- Average ROP of 66.3m/hr
- Landed the well and achieved 9.2/30deg doglegs
- Bit grade at TD: 1-1WT-A-X-0-NO-TD
TECHNOLOGIES
- Pacesetter’s Orbit RSS
- Short-Hop Live Link
- XPACE EM MWD

Download this Performance Highlight
Pacesetter’s Orbit RSS eliminates entire BHA and saves tripping time
By utilizing Pacesetter’s Orbit Rotary Steerable System, Canadian Natural Resources Limited was able to eliminate an entire BHA and a trip, finishing the build and lateral sections in one run, resulting in substantial time saved and reduced AFE costs. CNRL successfully landed the well from 45deg to 90deg in 7 hours.
Pacesetter’s combined technologies of our modified Orbit RSS and XEM MWD drilled 2,839m in a single run, completing the well at 4,787m MD. This was a “pacesetter” Septimus well for CNRL.
Congratulations to CNRL and the rig crews of Ensign 60 for this impressive achievement.
MONTNEY
OPERATOR Canadian Natural Resources Limited
HOLE SIZE 159mm
RUN DETAILS 1948m MD to 4787m MD
HIGHLIGHTS
- Landed the well from 45deg with a BURR of 6/30
- Pacesetter’s Orbit RSS achieved 6.5/30 outputs in the bottom of the Doig to the Montney
- Average ROP of 66.8 m/hr
TECHNOLOGIES
- Pacesetter’s Orbit RSS
- XEM MWD

Download this Performance Highlight
The Canadian drilling environment is one of the harshest in the world
For this reason, Pacesetter continues to upgrade the PowerDrive Orbit to meet client needs. Our Calgary based RSS team has implemented over 20 modifications to the original PowerDrive platform.
- Increased Control Collar OD
- Up-sized connections to NC-40
- Bias Body Redesign
- Electronics upgrade
- Hinge Pin redesign
- Heat condition plates
- Upgraded pad assembly
- Centralized Bearing Housing
- Case Hardening
- Shroud redesign
- More robust Combination Bearings
- Laser Cladding to Stab Blades
THE RESULT
PACESETTER CONTINUES TO MEET CLIENT NEEDS IN ALL DRILLING CONDITIONS
FORMATION Charlie Lake
HOLE SIZE 159MM
RSS TECHNOLOGY Pacesetter 5 ¼” Orbit
METERS DRILLED 4061m
ROP 43m/hr
SHOCK COUNTS 3.3 million over 50Gs
MAX SHOCK RECORDED 624G
Download this Performance Highlight
Grizzly Resources successfully drills an open hole sidetrack utilizing Pacesetter’s live at bit RSS BHA
Sidetracking with Pacesetter’s Orbit RSS configured in real time mode, Grizzly Resources saved substantial rig time on their most recent Valhalla well. Pacesetter’s live RSS BHA, in conjunction with proven XEM platform, had real time readings of inclination and gamma at bit, successfully drilling an open hole sidetrack in under 6 hours.
Communication, planning, and field level execution were key factors to the successful completion of this well.
Congratulations to Grizzly Resources Ltd. and the rig crews of PD 182 for this great accomplishment.
DOE CREEK
OPERATOR Grizzly Resources Ltd.
HOLE SIZE 159mm
HIGHLIGHTS LEG 1 LEG 2
DEPTH IN 574m 715m
TD DEPTH 1,011m 1,673m
METERS DRILLED 437m 985m
TVD 335m 335m
AVERAGE ROP 82.3 m/hr 55.3m/hr
TECHNOLOGIES
- Pacesetter’s Orbit RSS
- XEM MWD
Pacesetter’s Live RSS BHA offers:
- Bit to RSS Azimuthal Gamma at 1.79m
- Bit to RSS Continuous Inclination at 2.05m
- Bit to MWD Survey at 6.0m

Download this Performance Highlight
Pacesetter’s Orbit RSS drills more meters faster, reducing overall drilling days
Canadian Natural Resources Limited recently drilled two Cardium wells on the same pad; one with conventional tools and the other with Pacesetter’s Orbit RSS in the lateral. Both wells had 90 degree turns in their respective lateral sections.
By utilizing RSS, CNRL successfully drilled more meters in significantly less time. The RSS resulted in better ROP and also substantially reduced off bottom circulating time.
Congratulations to Canadian Natural Resources Limited and the rig crews of Ensign 419 on this impressive achievement.
CARDIUM
OPERATOR Canadian Natural Resources Limited
HOLE SIZE 156mm
HIGHLIGHTS CONVENTIONAL ORBIT RSS
TD DATE Mar 3, 2020 Mar 19, 2020
LOCATION Ferrier 38-7W5 Ferrier 38-7W5
DEPTH IN 2,290 2,288
ANGLE IN 71.61deg 71.77deg
METERS DRILLED 2,390 2,550
CIRC HRS 98.25 32.75
DRILLING HRS 79.00 55.75
AVERAGE ROP 30.3 45.7
TECHNOLOGIES
- Pacesetter’s Orbit RSS
- XEM MWD

Download this Performance Highlight
Pacesetter’s Orbit RSS drills 3,303m run with record ROP of 40.8m/hr
Utillizing Pacesetter’s Orbit RSS and XEM MWD, paired with NOV ReedHycalog’s 159mm TK53-B1 drill bit, CNRL drilled 3,303m in 81 hours resulting in a record ROP of 40.8m/hr.
Congratulations to Canadian Natural Resources Limited, the rig crew of Horizon 48, and NOV ReedHycalog on this great accomplishment.
MONTNEY
OPERATOR Canadian Natural Resources Limited
HOLE SIZE 159mm
HIGHLIGHTS
RUN DETAILS 2347m to 5650m
DRILLED 3303m
HOURS 81 hrs
ROP 40.8m/hr
TECHNOLOGIES
- Pacesetter’s Orbit RSS
- XEM MWD

Download this Performance Highlight
Ridgeback Resources Inc. drilled their fastest Bakken well to date in just 4.5 days using Pacesetter’s Redline Pulse MWD technology.
Congratulations to Ridgeback and the rig crew of Horizon 33 on this accomplishment.