
Using Pacesetter’s XPACE Dual Telemetry MWD platform, Hammerhead successfully drilled their fastest Montney well in the North Karr field to date reaching TD at 5,771m MD in 10 days from spud.
Congratulations to Hammerhead Resources Inc, Ramdar Resource Management Ltd, and the rig crews of Stampede 6 for this impressive accomplishment.
OPERATOR Hammerhead Resources Inc.
HOLE SIZE 171mm / 156mm
TOTAL DEPTH 5,771m MD
HIGHLIGHTS
TECHNOLOGY
Pacesetter’s modified Orbit RSS breaks records in the Pembina field Using Pacesetter’s combined technologies of XPACE EM MWD and our modified PowerDrive Orbit RSS, one Operator drilled 3 record wells in the Pembina field. The vertical and build sections on the final 2 wells were drilled while continuing on into the lateral reaching TD in […]
Read More
Aspenleaf Energy drills deepest MD Swan Hills well Congratulations to Aspenleaf Energy Limited together with the rig and crew of Ensign 32 on this achievement. Pacesetter’s combined technologies, paired with an Impulse “Hex Drive” motor and triple “Actipulse” friction reduction tools, drilled a tortuous and challenging well plan in the Swan Hills formation to a […]
Read More