By utilizing Pacesetter’s XPACE EM MWD platform, Ridgeback drilled their fastest Pembina well to date in just over 4 days making it the fastest well in the field.
Congratulations to Ridgeback Resources Inc, NL Fisher Supervision & Engineering, and the rig crews of PD 309 on this accomplishment!
OPERATOR Ridgeback Resources Inc.
HOLE SIZE 251mm / 159mm
TOTAL DEPTH 3265m MD
HIGHLIGHTS
TECHNOLOGIES

Pacesetter’s modified Orbit RSS breaks records in the Pembina field Using Pacesetter’s combined technologies of XPACE EM MWD and our modified PowerDrive Orbit RSS, one Operator drilled 3 record wells in the Pembina field. The vertical and build sections on the final 2 wells were drilled while continuing on into the lateral reaching TD in […]
Read More
Pacesetter’s Orbit RSS breaks records drilling 4,964m in a single run Using Pacesetter’s combined technology of XPACE EM MWD and our modified PowerDrive Orbit RSS, Canadian Natural Resources Limited drilled the longest 159mm RSS run, and their deepest Falher well in the Sundance field. The 4,964m lateral was completed in a single run, drilling for […]
Read More