
By utilizing Pacesetter’s XPACE EM MWD platform, Ridgeback drilled their fastest Pembina well to date in just over 4 days making it the fastest well in the field.
Congratulations to Ridgeback Resources Inc, NL Fisher Supervision & Engineering, and the rig crews of PD 309 on this accomplishment!
OPERATOR Ridgeback Resources Inc.
HOLE SIZE 251mm / 159mm
TOTAL DEPTH 3265m MD
HIGHLIGHTS
TECHNOLOGIES
Pacesetter’s modified Orbit RSS breaks records in the Pembina field Using Pacesetter’s combined technologies of XPACE EM MWD and our modified PowerDrive Orbit RSS, one Operator drilled 3 record wells in the Pembina field. The vertical and build sections on the final 2 wells were drilled while continuing on into the lateral reaching TD in […]
Read More
Aspenleaf Energy drills deepest MD Swan Hills well Congratulations to Aspenleaf Energy Limited together with the rig and crew of Ensign 32 on this achievement. Pacesetter’s combined technologies, paired with an Impulse “Hex Drive” motor and triple “Actipulse” friction reduction tools, drilled a tortuous and challenging well plan in the Swan Hills formation to a […]
Read More