
By utilizing Pacesetter’s XPACE EM MWD platform, Ridgeback drilled their fastest Pembina well to date in just over 4 days making it the fastest well in the field.
Congratulations to Ridgeback Resources Inc, NL Fisher Supervision & Engineering, and the rig crews of PD 309 on this accomplishment!
OPERATOR Ridgeback Resources Inc.
HOLE SIZE 251mm / 159mm
TOTAL DEPTH 3265m MD
HIGHLIGHTS
TECHNOLOGIES
Aspenleaf Energy drills deepest MD Swan Hills well Congratulations to Aspenleaf Energy Limited together with the rig and crew of Ensign 32 on this achievement. Pacesetter’s combined technologies, paired with an Impulse “Hex Drive” motor and triple “Actipulse” friction reduction tools, drilled a tortuous and challenging well plan in the Swan Hills formation to a […]
Read More
Pacesetter’s Orbit RSS drills 4,425m record lateral run Congratulations to Bonavista Energy Corporation and the rig crew of Savanna 656 on this impressive achievement. GLAUCONITIC OPERATOR Bonavista Energy Corporation HOLE SIZE 156mm RUN DETAILS 2,625m MD to 7,050m MD BACKGROUND Using Pacesetter’s Orbit RSS and Redline Pulse […]
Read More