
Featured
Pacesetter’s Orbit RSS drills 4,792m in a single run Canadian Natural Resources Limited utilized Pacesetter’s combined technologies of XPACE EM MWD and our modified Orbit RSS to successfully drill their fastest 171mm monobore in the Karr field. The record well was completed in less than 6.5 days from spud at 5,413m MD. The 4,792m lateral […]
Read More
Hammerhead drills their fastest Montney well with conventional tools and XPACE DT MWD Using Pacesetter’s XPACE Dual Telemetry MWD platform, Hammerhead successfully drilled their fastest Montney well in the North Karr field to date reaching TD at 5,771m MD in 10 days from spud. Congratulations to Hammerhead Resources Inc, Ramdar Resource Management Ltd, and the […]
Read More
Pacesetter’s Orbit RSS breaks records drilling 4,817m in a single run Using Pacesetter’s combined technology of XPACE Dual Telemetry MWD and our modified PowerDrive Orbit RSS, CPEC drilled their longest run and Pacesetter’s third longest run to date. The 4,817m lateral was completed in a single run, drilling for 85.5 hours with an average ROP […]
Read More
By utilizing Pacesetter Directional and Baker Bits services, Lycos successfully drilled a 39 leg Sparky well, with an average sidetrack time of 42.4 minutes. Lycos Energy Inc. worked in partnership with NL Fisher Supervision and Engineering Ltd., Baker Hughes Canada Bits, Secure Energy Services Drilling Fluids and Stampede Drilling Inc. (Stampede 22). SPARKY OPERATOR […]
Read More
Pacesetter’s modified Orbit RSS breaks records in the Pembina field Using Pacesetter’s combined technologies of XPACE EM MWD and our modified PowerDrive Orbit RSS, one Operator drilled 3 record wells in the Pembina field. The vertical and build sections on the final 2 wells were drilled while continuing on into the lateral reaching TD in […]
Read More
Pacesetter’s Orbit RSS breaks records drilling 4,964m in a single run Using Pacesetter’s combined technology of XPACE EM MWD and our modified PowerDrive Orbit RSS, Canadian Natural Resources Limited drilled the longest 159mm RSS run, and their deepest Falher well in the Sundance field. The 4,964m lateral was completed in a single run, drilling for […]
Read More
Fastest of 4 Montney wells in the Valhalla field drilled in less than 8 days Canadian Natural Resources Limited drilled their fastest Montney well in the Valhalla field by utilizing Pacesetter’s Redline Pulse MWD along with our High Speed and Performance motor. The single run 2,971m lateral was drilled at an average ROP of 63.6m/hr, […]
Read More