24,116m Single Run Multilateral

Lycos Energy drills 16-leg multilateral well in a single continuous run

Pacesetter’s XPACE EM MWD combined with our SINC technology allowed Lycos, working in partnership with Ramdar, to successfully complete a 16-leg multilateral well in the Sugden field, reaching TD at 24,116m MD.

Congratulations to Lycos Energy Inc, Ramdar Resource Management Ltd, the rig crews of Bonanza 4, and Pacesetter’s DD and MWD Supervisors for the outstanding execution of this impressive well.

WASECA

OPERATOR                Lycos Energy Inc.
HOLE SIZE                 200mm
TOTAL DEPTH           24,116m MD

HIGHLIGHTS

  • 24,116m single run
  • 409 hours BRT
  • 293.25 circulating hours
  • 16 legs

TECHNOLOGIES

  • XPACE EM MWD
  • Pacesetter SINC (Secondary Inclination)
  • Drilformance DF513 bit

 