By utilizing Pacesetter Directional and Baker Bits services, Lycos successfully drilled a 39 leg Sparky well, with an average sidetrack time of 42.4 minutes.

Lycos Energy Inc. worked in partnership with NL Fisher Supervision and Engineering Ltd., Baker Hughes Canada Bits, Secure Energy Services Drilling Fluids and Stampede Drilling Inc. (Stampede 22).
OPERATOR Lycos Energy Inc.
HOLE SIZE 222mm / 159mm
TOTAL DEPTH 15,020m MD
HIGHLIGHTS
Pacesetter’s Orbit RSS breaks records drilling 4,964m in a single run Using Pacesetter’s combined technology of XPACE EM MWD and our modified PowerDrive Orbit RSS, Canadian Natural Resources Limited drilled the longest 159mm RSS run, and their deepest Falher well in the Sundance field. The 4,964m lateral was completed in a single run, drilling for […]
Read More
Fastest of 4 Montney wells in the Valhalla field drilled in less than 8 days Canadian Natural Resources Limited drilled their fastest Montney well in the Valhalla field by utilizing Pacesetter’s Redline Pulse MWD along with our High Speed and Performance motor. The single run 2,971m lateral was drilled at an average ROP of 63.6m/hr, […]
Read More