Using Pacesetter’s combined technologies of XPACE EM MWD and our modified PowerDrive Orbit RSS, one Operator drilled 3 record wells in the Pembina field. The vertical and build sections on the final 2 wells were drilled while continuing on into the lateral reaching TD in one run.
The fastest of the 3 wells was completed in only 4 days from spud to TD.
Congratulations to the Operator and the rig crews for these impressive achievements.
HOLE SIZE 159mm
1st LATERAL HIGHLIGHTS
METERS DRILLED 2,593m MD
CIRC HOURS 12.5 hrs
AVERAGE ROP 74.4m/hr
2nd VERTICAL CURVE LATERAL HIGHLIGHTS
METERS DRILLED 3,448m MD
CIRC HOURS 13.75 hrs
AVERAGE ROP 86.7m/hr
3rd VERTICAL CURVE LATERAL HIGHLIGHTS
METERS DRILLED 2,886m MD
CIRC HOURS 10.5 hrs
AVERAGE ROP 77.5m/hr
TECHNOLOGIES
Aspenleaf Energy drills deepest MD Swan Hills well Congratulations to Aspenleaf Energy Limited together with the rig and crew of Ensign 32 on this achievement. Pacesetter’s combined technologies, paired with an Impulse “Hex Drive” motor and triple “Actipulse” friction reduction tools, drilled a tortuous and challenging well plan in the Swan Hills formation to a […]
Read More
By utilizing Pacesetter Directional and Baker Bits services, Lycos successfully drilled a 39 leg Sparky well, with an average sidetrack time of 42.4 minutes. Lycos Energy Inc. worked in partnership with NL Fisher Supervision and Engineering Ltd., Baker Hughes Canada Bits, Secure Energy Services Drilling Fluids and Stampede Drilling Inc. (Stampede 22). SPARKY OPERATOR […]
Read More