Using Pacesetter’s combined technologies of XPACE EM MWD and our modified PowerDrive Orbit RSS, one Operator drilled 3 record wells in the Pembina field. The vertical and build sections on the final 2 wells were drilled while continuing on into the lateral reaching TD in one run.
The fastest of the 3 wells was completed in only 4 days from spud to TD.
Congratulations to the Operator and the rig crews for these impressive achievements.
HOLE SIZE 159mm
1st LATERAL HIGHLIGHTS
METERS DRILLED 2,593m MD
CIRC HOURS 12.5 hrs
AVERAGE ROP 74.4m/hr
2nd VERTICAL CURVE LATERAL HIGHLIGHTS
METERS DRILLED 3,448m MD
CIRC HOURS 13.75 hrs
AVERAGE ROP 86.7m/hr
3rd VERTICAL CURVE LATERAL HIGHLIGHTS
METERS DRILLED 2,886m MD
CIRC HOURS 10.5 hrs
AVERAGE ROP 77.5m/hr
TECHNOLOGIES

Pacesetter’s Orbit RSS breaks records drilling 4,964m in a single run Using Pacesetter’s combined technology of XPACE EM MWD and our modified PowerDrive Orbit RSS, Canadian Natural Resources Limited drilled the longest 159mm RSS run, and their deepest Falher well in the Sundance field. The 4,964m lateral was completed in a single run, drilling for […]
Read More
Fastest of 4 Montney wells in the Valhalla field drilled in less than 8 days Canadian Natural Resources Limited drilled their fastest Montney well in the Valhalla field by utilizing Pacesetter’s Redline Pulse MWD along with our High Speed and Performance motor. The single run 2,971m lateral was drilled at an average ROP of 63.6m/hr, […]